
ILT-U-3216
Electric determination
DETERMIANTION | METHOD |
| Hail test MQT17 (tasting time 1.5 months) | IEC 61215 |
| Thermal cycling test MQT11 (tasting time 1.5 months) | IEC 61215 |
| Humidity-freeze test MQT12 (tasting time 1 month) | IEC 61215 |
| Damp heat test MQT13 (tasting time 1.5 months) | IEC 61215 |
| Initial preliminary test for panel MQT 01 MQT 06, 1 MQT 03 MQT 15 | IEC 61215 |
| Final preliminary test for panel MQT 06, 1 MQT 03 MQT 15 | IEC 61215 |


